Ger-Devils said:
Surprising how quick flat packs arenas go up. Look at city's! The only slow process is the structure then it's up within weeks and then biggest part is the outfit. Would be nice to see a wall of current and ex players photos up on the walls around the arena
I too was shocked how quickly the new City Stadium went up. Each week you went you could notice how much work had been done on it.
Can anyone remember how long our current Tent took to be built? It was supposed to be much quicker because it was delayed due to poor choice of people to build it - e.g. one of the arches falling over and having to be replaced.
Something in the back of my head also makes me think that the new rink won't be built on the site of the current tent, but to the side? So it would be possible to stat building the new rink whilst still using our current tent.
Also, wasn't there talk of some of the Sports Village being used by other countries to train during the 2012 Olympics? If so - then it would definately need to be built by the start of 2012 at least.